TBM GRAPHICS, LLC

  • Home
  • About Us
  • Service
  • UPGRADES
  • Parts
  • Successes
  • Contact
  • Home
  • About Us
  • Service
  • UPGRADES
  • Parts
  • Successes
  • Contact

UPGRADE/REPAIR

Picture

GSTC PLC AND SCREEN

If a system is not heating properly, this could be due to failure of the KLASCHKA PLC. TBM has replaced and upgraded several components within the KLASCHKA PLC with consistent success. These units are thoroughly tested off-site in our shop before shipping. 

​The screen often needs to be repaired as well. Call our office to set up a time to discuss this option in more detail. 
Picture

CHILLER

PLC and I/O modules wear with age indicated by multiple fault codes that can't be cleared however the system itself may be in good condition. Upgrading these components, along with RTD temperature sensors is a cost effective way to return your system to proper function. 
​
* unit must not be password protected
Picture

UV FINAL AND INTERSTATION CASSETTES

TBM has several upgrades to the UV cassettes themselves that address many of the repeated faults that stop production and protect the longevity of your rebuild. These modifications often increase production and reliability. Additional changes may be necessary on-site for additional improved function to address over-temp, over cooling, and flow faults.  for more information on increasing production speed, reliability, and quality, call our office to set up a time to discuss this information.

HAK TUBES

The effectiveness of the HAK cassette is accomplished best when the HAK complete element is seated air tightly onto the tube. Most HAK tubes hole are stripped out, making it impossible to be air tight and unsecured. 
TBM has developed a way to repair and upgrade these tubes which are resistant to stripping. Tubes or even the whole cassette may be shipped to our shop for repair/upgrade. Call our office for details. 
Picture

Contact Us

Subscribe to
​TBM News/Email List

Copyright © 2015